Fort Myers USPS Security Upgrades

This project includes but is not limited to: Replacing an automatic sliding gate controller, existing pedestrian gates, impact doors, CIO HVAC AHU, CCTV systems, intercom systems and gate release systems. Installation of new ePACS, doors/door hardware, steel rollup doors, lightning protection systems and underground counterpoise systems. Construction of new employee entrance vestibule.

See below to download the project files:

Solicitation Final

Uploaded on 5/2/2022.

Download

Scope of Work

Uploaded on 5/2/2022.

Download

Architectural Drawings

Uploaded on 5/2/2022.

Download

Electrical Drawings

Uploaded on 5/2/2022.

Download

Mechanical Drawings

Uploaded on 5/2/2022.

Download

Specifications

Uploaded on 5/2/2022.

Download

Alternates

Uploaded on 5/2/2022.

Download

Allowances

Uploaded on 5/2/2022.

Download

Schedule of Values

Uploaded on 5/2/2022.

Download

Sourcing Events for Suppliers

Uploaded on 5/2/2022.

Download

Offeror's Return Package

Uploaded on 5/2/2022.

Download

Environmental Report - Asbestos Drawings

Uploaded on 5/2/2022.

Download

Environmental Report - Asbestos Report

Uploaded on 5/2/2022.

Download

Environmental Report - LBPS

Lead-Based Paint Survey
Uploaded on 5/2/2022.

Download

Environmental Report - LBPS Drawings

Lead-Based Paint Survey

Uploaded on 5/2/2022.

Download

Addendum 01

Uploaded on 5/2/2022.

Download

Addendum 01 - Architectural

Uploaded on 5/2/2022.

Download

Addendum 01 - Electrical

Uploaded on 5/2/2022.

Download

Addendum 01 - Mechanical

Uploaded on 5/2/2022.

Download

Addendum 02

Uploaded on 5/9/2022.

Download

Addendum 03

Uploaded on 5/11/2022.

Download

Addendum 04

Uploaded on 5/18/2022.

Download

Address

6375 Harney Rd, Suite 105
Tampa, FL 33610, US

Office hours:

Monday - Friday
7:30am - 4:30pm

Saturday - Sunday
CLOSED